x2 IN-LINE BLADE FUSE HOLDER WEATHERPROOF CAP LONG LEAD LEAD LENGTH 700MM LONG

x2 IN-LINE BLADE FUSE HOLDER WEATHERPROOF CAP LONG LEAD LEAD LENGTH 700MM LONG

$17.60

Availability: 5000 in stock

Contents :

2 x 700mm long Weatherproof STD Fuse Holder (FUSE NOT INCLUDED)

Ideal for fusing close to the battery and running to your accessory with soldering extra wire.

A quality inline weatherproof inline fuse holder sealed for protection against moisture and dust.
Suitable for all forms of accessory installations @ up to 35 amps using STD blade fuses. These are a quality product from JAS, one of Australia’s premium auto electrical suppliers, and used in our workshop daily.

Rated for up to 35 amps @ 32 volts.
Wire length – 300mm
Cable size – 6mm auto (4.59mm2) 700mm long

Note:

If you require a 10Pkt of fuse holders, please see our other listing in our eBay store.

Manufacturer Part Number

Brand

Type

Scroll to Top